Project Name

Sulphur Handling Facility, Abu Dhabi

  • Owner:....
  • Plant Capacity: 7,500 MTPD
  • Location:Abu Dhabi, UAE
  • Engineer Consultant: Archimedes Engineers Pvt Ltd
  • Service Duration: 3 Weeks
  • Project Cost range:
  • Services Offered: Cost Estimation Services
The purpose of the FACILITY, is to receive molten sulfur via rail cars or road tankers, store the molten sulfur, solidify the molten Sulfur, store the solid sulfur, and then load the solid sulfur onto a ship. The capacity of the FACILITY in phase I is 1600 MTPD which is expanded to 7500 MTPD in phase II. The facility will be designed in a modular fashion such that the expansion is possible with minimum interruption to production facility. .

Archimedes Engineers Pvt Ltd appointed bakdop Consultants as Cost Estimation Consultants for the project.